Foul Play Suspected in Direct Assignment for Riau-1 Power Plant Procurement

A note on the examination of witness Rudi Herlambang (Director of Samantaka) in the trial for the alleged corruption case of the mine-mouth Riau-1 power plant (PLTU MT Riau-1) construction against defendant Johanes Budisutrisno Kotjo

 

For further details, contact: Arip Yogiawan - YLBHI (+62 812 1416 4445, [email protected]) Dwi Sawung – WALHI (+62 815 6104 606, sawung@wp_walhi.local) Hendrik Siregar - AURIGA ([email protected])